Editor’s Pick: Laptop to Power Through Intense Jobs Anywhere
November 28, 2018
NVIDIA graphics combined with Intel's new processor generation make mobile workstation brawny.
Shuttle Computer Group Unveils Mini Cube Series in Small Form Factor
November 28, 2018
They reportedly offer the performance of a desktop PC from a box a third of the size.
BOXX Debuts Next-Gen Workstations
November 26, 2018
APEXX Enigma S3 features Autodesk Maya and Arnold, but the workstation also offers professional grade performance for all 3D CAD, animation, motion media and rendering applications including Autodesk 3ds Max, Revit, AutoCAD and Navisworks.
Bright Computing Announces Provisioning and Management of Compute for the Intelligent Edge in Bright Cluster Manager 8.2
November 19, 2018
Bright 8.2 automates the process of imaging and managing servers that extend compute to the edge.
Bright Computing Releases Version 8.2 of Bright Cluster Manager, Bright OpenStack and Bright Cluster Manager for Data Science
November 14, 2018
New features focus on edge computing, containers, standards compliance and increased performance.
Top500 Supercomputer List Updated
November 13, 2018
The 52nd edition of the TOP500 list has five U.S. Department of Energy (DOE) supercomputers in the top 10 positions.
BOXX Introduces Next-Generation Workstations at Autodesk University
November 13, 2018
Products include new overclocked APEXX S-Class workstation featuring 9th-generation Intel processor and APEXX T-Class workstation with overclocked 2nd-Gen AMD Ryzen Threadripper.
Eurocom Launches Supercomputer Class Laptop
November 12, 2018
The Tornado F7 Mobile Workstation from Eurocom is powered by 8cores/16 threads Intel i9 9900K processor with NVIDIA’s high-performance Quadro P52000 upgradeable GPU technology.
AMD Unveils 7nm Datacenter GPUs
November 7, 2018
AMD Radeon Instinct MI60 and MI50 accelerators with compute performance, high-speed connectivity, fast memory bandwidth and updated ROCm open software platform power deep learning, HPC, cloud and rendering applications.
Bright Computing Plans to Deliver Exascale Cluster Management in 2020
November 6, 2018
Bright Cluster Manager software to support clusters of 100,000+ nodes well before the first exascale systems are scheduled to be delivered.
ProMagix HD80 Threadripper and Raptor Z95 Customizable Workstations Unveiled
November 5, 2018
Now powered by AMD Ryzen Threadripper, the ProMagix HD80 Workstation features up to 32 physical cores and 64 total processing threads for multithreaded performance;
SPECwpc Releases New Workstation Benchmark
November 5, 2018
The renamed SPECworkstation 3 performance evaluation software features new and updated workloads throughout the suite; it is free to users.
@Xi PowerGo XT Mobile Workstation: Portable Power Champ
November 2, 2018
With its fast CPU and high-end NVIDIA graphics, we expected the Xi PowerGo XT to deliver great performance, but the results still surprised us.
OSC Installing new Pitzer Cluster Built by Dell EMC
November 1, 2018
The Pitzer Cluster was expected to be at full production status and available to clients in November 2018.
Dell Precision 7820 Tower Workstation: Compact Power
November 1, 2018
This new Dell workstation packs dual CPUs in an innovative chassis.
Latest News
3Q GPU Shipments Up 3.4%
Data center GPUs were up an average of 1.7% from last quarter.
FREE WEBINAR DEC. 5: Augmented Reality for First Time Right Assembly
In this webinar, Dassault Systèmes will discuss how augmented reality (AR) technology can optimize shop floor operations by improving...
FREE WEBINAR DEC. 12: Transformation Through Modeling and Simulation
In this webinar, Dassault will demonstrate how modeling and simulation (MODSIM) can enable business transformation by reducing development time, accelerating...
The Future Was (And Is) Now
By the way, if you missed this year's Design & Engineering Summit, you can still sign up to stream all of...
Update for KISTERS 3DViewStation Released
JT is fast, requires less storage space, and allows for operation without performance loss.
Supermicro Delivers Direct-Liquid-Optimized NVIDIA Blackwell Solutions
The new SuperCluster will increase the number of NVIDIA HGX B200 8-GPU systems in a liquid-cooled rack, according to Supermicro.
All posts
New & Noteworthy
New & Noteworthy: Future-Proof Foundation for Employee Training and Education
Eagle Point Software's Peak Experience for Pinnacle Series adds AI chat, improved...
Eliminate Physical Clamping – With Simulation
The Virtual Clamping tool in ANSA (VCA) from BETA CAE Systems eliminates...
New & Noteworthy: Fast, Flexible and Scalable Simulation – In the Cloud
Ansys Access on Microsoft Azure enables seamless deployment of industry-leading simulation tools...
New & Noteworthy: Safe, Cost-Effective Metal 3D Printing - Anywhere
Desktop Metal’s Studio System offers turnkey metal printing for prototypes and...